Fremont & 42nd Avenue Station
Fremont & 42nd Avenue - Station Plan PDF
Station Consideration |
Planned Condition* |
Intersection
location |
Fremont & 42nd Avenue |
Platform location |
Southbound: Nearside of 42nd Avenue on northwest corner
Nearside improves constructability and reduces parking impact for small businesses farside of intersection.
Northbound: Nearside of 42nd Avenue on southeast corner
Farside platform not possible due to driveway access about 10’ from curb.
|
*Final conditions to be developed during the engineering/design process.
Back to D Line Station Plan
Station Consideration |
Planned Condition* |
Station spacing |
Southbound: About 0.5 mi to Fremont & Dowling
Within guidelines of about half-mile station spacing.
Northbound: About 0.35 mi to 44th & Humboldt-Girard area
Shorter station spacing than guidelines due, in part, to provide access to Hamilton Manor senior housing.
|
Existing ridership within
a block, or about 1/8 mile
(Fall 2016) |
About 165 boardings per weekday
|
Platform location compared
to existing bus stop |
Southbound and northbound: At existing bus stop |
Connecting service |
Routes 721 and 724 |
Parking changes |
Southbound and northbound: Reduction of about 2-3 parking spaces at each location due to the expansion of existing bus stop zone
Existing bus stop zones would be extended to accommodate curb taper.
|
Station Consideration |
Planned Condition* |
Curb configuration |
Southbound and northbound: Bumpout
Bumpouts will maximize operational efficiency and pedestrian space.
|
Platform length |
Southbound and northbound: 60’ platform
Platforms will be designed to accommodate a 60’ BRT vehicle.
|
The intersection of Fremont and 42nd Avenue is a commercial node. Ridership at this location is higher than at surrounding stops.
Project coordination: Emerson/Fremont Avenues bicycle-pedestrian improvement project
-
D Line station planning in north Minneapolis between Plymouth Avenue and 42nd Avenue occurred in conjunction with the development of the City of Minneapolis Emerson-Fremont Avenues bicycle-pedestrian improvement project. Outreach and engagement occurred separately between projects.
-
Station locations were coordinated in advance of the city’s 2014 Regional Solicitation application and confirmed in late 2016.
-
Coordination ensures that bicycle-pedestrian improvements (planned for construction in 2018) will not be impacted by D Line construction (planned for construction in 2020/2021, pending full project funding).