44th Avenue & Humboldt-Girard area Station

44th Avenue & Humboldt-Girard area - Station Plan PDF
Station Consideration Planned Condition*
Intersection 
location
44th Avenue & Humboldt-Girard area
Platform location

Southbound and northbound: On 44th Avenue between Humboldt and Girard; quadrant to be determined

Platform locations within the 44th Avenue & Humboldt-Girard area to be determined in coordination with Hennepin County’s 44th Avenue/Webber Parkway reconstruction design process.

Hennepin County is planning to reconstruct 44th Avenue/Webber Parkway in 2020. The identification of platform locations will be determined as project design advances in 2018.

*Final conditions to be developed during the engineering/design process.

Back to D Line Station Plan

44th Avenue and Humboldt - Girard area station. Platform locations will be determined in 2018.

Station Consideration Planned Condition*
Station spacing

Southbound: About 0.35 mi to Fremont & 42nd Avenue
Shorter station spacing than guidelines due, in part, to provide access to Hamilton Manor senior housing

Northbound: About 0.5 mi to 44th Avenue & Penn-Oliver area
Within guidelines of about half-mile station spacing

Existing ridership within
a block, or about 1/8 mile
(Fall 2016)

About 235 boardings per weekday

Platform location compared
to existing bus stop
Southbound and Northbound: To be determined
Connecting service Routes 721 and 724
Parking changes

Southbound and northbound: To be determined

Parking changes dependent upon coordination with Hennepin County’s 44th Avenue/Webber Parkway reconstruction project design process.

Station Consideration Planned Condition*
Curb configuration

Southbound and northbound: To be determined

Curb configuration dependent upon coordination with Hennepin County’s 44th Avenue/Webber Parkway reconstruction project design process.

Platform length

Southbound and northbound: 60’ platform

Platforms will be designed to accommodate a 60’ BRT vehicle.

Project coordination: 44th Avenue/Webber Parkway reconstruction project

  • Hennepin County is planning to reconstruct 44th Avenue/Webber Parkway from Penn to Fremont in 2020

  • The identification of platform locations is not feasible until reconstruction project design advances in 2018.

  • In coordination with Hennepin County, staff has determined that D Line platforms are generally feasible on 44th Avenue between Penn and Oliver. The City of Minneapolis also supports the placement of a D Line station in the 44th Avenue and Penn-Oliver area. Design considerations will include bicycle-transit interactions in an effort to maintain bicycle facilities throughout the length of the 44th Avenue reconstruction project.

  • To minimize disruption, construction of D Line platforms will be coordinated with the 44th Avenue/Webber Parkway reconstruction project to the extent possible.