Current Designs
The Metropolitan Council completed the project's 30% design roll plots in 2022 that reflect the route south of Maryland Avenue in St. Paul. View conceptual design plans for stations in Maplewood and St. Paul.
What’s next?
Once a new Locally Preferred Alternative has been recommended by the Bronze Line Corridor Management Committee later in 2025, project staff will work toward completing 15% Concept Plans for the portion of the project in Maplewood that has changed.
At the conclusion of design and engineering work, the project will have the specifications and drawings that will guide construction. Design concepts that are further studied and specified during design and engineering include:
- Vehicle and vehicle technology
- Route and alignment
- Station locations and amenities
- Traffic
- Pedestrian facilities
- Modifications to existing Maplewood Mall Transit Center Park & Ride
- Landscaping
- Storm water drainage and water quality
- Utilities
- Bridges and underpasses
- Transit service plans