Metro Transit’s Materials Management Support Facility will be located at 755 Industrial Blvd. NE in Minneapolis near the intersection of Broadway St. NE and Hwy. 280. The warehouse will be large enough to accommodate all Metro Transit warehouse functions in one location, eliminating the need for separate hubs for bus and rail materials that operate today. It is expected to accommodate future growth with a gross building area of more than 175,000 square feet and 32-feet high ceilings.
Metro Transit will improve the existing structure for transit purposes. The 10-acre site includes 100 parking stalls, 20 trailer spaces, and a rear-dock loading/unloading area adequate for warehousing uses.
The Materials Management Support Facility timeline includes design in 2026, construction in 2026-2027, and start of operations in 2028.