Skip to main content

Rider Alerts

Detour and bus stop changes effective Monday, May 18 for routes 17 and 25

For the following route(s): 17, 25.

Starting Monday, May 18, MnDOT will begin work on the 3rd Ave./Central Ave. bridge that spans the Mississippi River between downtown Minneapolis and NE/SE Minneapolis that will initially reduce traffic lanes on the bridge and eventually close the bridge for a two-year period beginning in January 2021.

As result of the construction the Downtown Zone stops on the NE/SE side of the bridge will change for routes 17 and 25 as follows:

  • To downtown, Stop #12282 on Central at 2nd St. SE will be closed and Stop #46801 on Central between 4th St. SE and University will become the temporary border of the Downtown Zone.
     
  • From downtown, Stop #14952 on Central at University will be closed and Stop #14953 on northbound Central at 4th St. SE will become the temporary border of the Downtown Zone.

View other details and map of project here.

Please call 612-373-3333, to speak with a transit expert.